A takeoff is the quantity survey behind your bid — every wall, slab, opening, and finish measured from the bid drawings and organized by CSI MasterFormat division. We do the measuring so you only do the pricing: plug in your labor rates and markup, and submit your bid.
Don't see your project listed? Upload the drawings and tell us which trades you need — we build the same verified takeoff for your job and reply with a quote and turnaround, usually within one business day.
No commitment — you get a quote before any work starts.
Disclaimer: All takeoffs are provided as a baseline estimate based on the drawing set dated as shown on each project listing. MAAK Management utilizes advanced digital measurement tools; however, the purchasing contractor is solely responsible for verifying that the takeoff corresponds to the most current and up-to-date set of issued-for-bid drawings, and for performing final verification of all quantities and field conditions prior to bid submission. Drawing revisions, addenda, or re-issued sets may affect quantities. MAAK Management assumes no liability for bid results or discrepancies arising from updated drawing revisions after the date noted on the takeoff.